Get the latest Airstream For Sale listings directly to your inbox!
International Sovereign Land Yacht Project. Had a large water leak from frozen pipes. Inner wall skin was removed and vinyl stripped off 98%. The wood Floor was cut out. The body was lifted off the Frame. Frame was sandblasted primed and painted, all rust was repaired or replaced. New floor fitted and Body put on frame and was bolted to frame. Needs a little more fitting as I was forced to due this task in a hurry. Windows are all with trailer but most need work. All Inner and belly skins are in trailer. All interior window frames are in trailer, New Wool insulation is included. PVC and Valve for floor heating included. Two new Jacks and 4 old Jacks are included.2 Rolls of plastic to cover insulation and a roll of insulation for under heated floor included. Trailer had Individual awnings and they are included but in bad shape. Had a set of awning mounts made they are on shown in picture of awning on trailer. After several years and doing 95% myself, I am to old and cannot finish this project. I am sure I left something out. Feel free to contact me.